December 26, 2025

Opening of Tonga Power Ltd’s CBD Branch

image-6

5 August 2020

The Hon. Prime Minister, Dr. Rev. Pohiva Tu’i’onetoa, opened the new Tonga Power CBD Branch at the Ground floor of the Taumoepeau Building in Nuku’alofa on August 3rd, 2020.